Construction and Inspection
- Post construction punch list picture and video documentation can easily be obtained after the scaffolding and man lifts have left the job site or work area.
- Interior wall leakage is often discovered when the exterior platforms have moved off and the interior walls are being installed or finished.
- Over The Edge will team with the GC and subcontractors to perform required work within job specifications to get the building turned over to the owner without the high cost and delay of remobilizing manlifts and scaffolding.
- Warranty work on high exterior walls and accent lighting locations can come at a very high cost after the building has been turned over and occupied.
- Over The Edge is nationally certified through SPRAT (Society of Professional Rope Access Technicians) to meet rigorous General Contractor job safety requirements.
- Certificate of Insurance is common and available upon request.